Services:
- Construction of fuel, oil and lubricants storages;
petrol/gas filling stations;
motor ways;
railway access roads;
water and sewer networks;
pond vaporizer;
trench anti-filtration curtain at the quarry site;
industrial buildings, residential buildings, dormitories, multifunctional roadside service complexes;
- Installation of technological equipment;
- Installation of metal constructions;
- Painting and sand-blasting work;
Staff of subdivision is 41 people.
Facilities put into operation:
Facilities commissioned:
- • Oil depot with a total capacity of 15,000 m³ for storing light petroleum products – Aktobe, 2014;
- • Administrative and utility building of 600 m² – Aktobe, 2014;
- • Reconstruction and construction of a tank farm of 5 tanks for JSC Donskaya Neftebaza – Khromtau, 2015;
- • Explosives warehouse for Aktyubinsk Copper Company LLP – 2016;
- • Reconstruction and construction of a tank farm of 4 tanks for JSC Donskaya Neftebaza – Khromtau, 2016;
- • Runway repair – JSC Aktobe International Airport, 2016;
- • Construction of our own tank farm at an oil depot with a capacity of 5,000 m³, a garage for trucks – Aktobe, 2017;
- • Construction of two new generation petrol stations for Batys Zher LLP – Aktobe, 2018;
- • Camping for IBG Catering LLP with a car service station and a car wash – Aktobe-Orsk highway, 2018;
- • Reconstruction of our own tank farm of a bitumen storage facility with an expansion of 3,500 m³ – Aktobe, 2018;
- • Construction of a railway access road for Elzhas LLP at Kazakhstan station in the industrial zone of Aksai, Burlin district, West Kazakhstan region – 2019;
- • Construction of a building for a multifunctional sports shooting complex for the Public Association “Practical Shooting Federation of the Aktobe Region” – Aktobe, 2020;
- • Construction of a contour drainage system with pumping of drainage waters into the evaporation pond of the Limannoye deposit, Khromtau district, Aktobe region (evaporation pond). 1st stage, 1st, 2nd, 3rd section for KazGeoRud LLP – 2020, 2022, 2025;
- • Construction of a trench anti-filtration curtain for a quarry at the industrial site of the Limannoye deposit (with geomembrane insulation), Aktobe region, Khromtau district, for KazGeoRud LLP – 2021;
- • Construction of a road for transporting ore in the amount of 1,400 thousand tons/year from the industrial site of the Limannoye deposit located in the Kopinsky rural district, Khromtau district, Aktobe region to the mining and processing plant of Aktobe Copper Company LLP located in the village of Koktau, Khromtau district, Aktobe region, for KazGeoRud LLP – 2025.oleum storage depot for the storage of light oil products, with overall volume of 15,000
Construction and installation subdivision is equipped with:
- bulldozers;
- loaders;
- excavators;
- canes
- dump trucks;
Special equipment
- air compressors;
- sand-blasting equipment;
- welding equipment;
- equipment for welding of large-diameter plastic pipes.
Contact Information:
+ 7 (7132) 402900
Legal address: Republic of Kazakhstan, 030011 Aktobe, 41 razyezd, building 324.
E-mail: info@corp-in.com