Construction and installation subdivision

Services:

  • Construction of fuel, oil and lubricants storages, drilling sites, motor ways, industrial buildings, residential buildings, dormitories, water and sewer networks;
  • Installation of technological equipment;
  • Installation of metal constructions;
  • Construction of tanks;
  • Painting and sand-blasting work;

Staff of subdivision is 50 people.

Facilities put into operation in 2014:

  • Petroleum storage depot for the storage of light oil products, with overall volume of 15,000 cubic meters,  Aktobe city;
  • Administrative office of 600 square meters;

Current projects:

  • Garage for 30 cars, Badamsha village;
  • Dormitory for 80 people, Badamsha villag,  Mamytskyi production field;

Construction and installation subdivision is equipped with:

  • Bulldozers;
  • Loaders;
  • Excavators;
  • Dump trucks;
  • Air compressor;
  • Sand-blasting;
  • Welding equipment;

Contact Information:

+ 7 (7132) 402900 ext. 2111, +7 7710240909

Legal address: Republic of Kazakhstan, 030011 Aktobe, 41 razyezd, building 324.

E-mail: info@corp-in.com